Kirovets-1
« Back to List« Go to the U.S.S.R. Tech Tree


Kirovets-1
The Kirovets-1 project (IS-3, prototype No. 1) was developed from July through November 1944. The prototype was built at the Chelyabinsk Kirov Plant in September–October 1944. From December 18 through December 24, 1944, the vehicle underwent trials at the NIBT proving grounds in Kubinka. After it was decided to manufacture a pilot series of the modified IS-2 with a hull proposed by engineers of Plant No. 100 and Central Research Institute-48, the work on the Kirovets-1 was discontinued.


122 mm D-25TA


Kirovets-1


10RKM


V-11-Kirovets-1


Kirovets-1
Shell Types:

APCR

HEAT

HE
Equipment:















Consumables:










Firepower: | |||||||||
| Ammunition | 30 (rounds) | ||||||||
| Caliber | 122 (mm) | ||||||||
| Damage | 390 / 390 / 530 (HP) | ||||||||
| Penetration | 221 / 270 / 61 (mm) | ||||||||
| Rate of Fire | 4.62 (rounds/min) | ||||||||
| Average Damage per Minute | 1800 (HP) | ||||||||
| Shells in the Magazine | |||||||||
| Time for Loading Between Shots | (s) | ||||||||
| Time for Complete Loading | (s) | ||||||||
| Gun Loading | 13.00 (s) | ||||||||
| Aiming Time | 3.10 (s) | ||||||||
| Dispersion at 100 m | 0.45 (m) | ||||||||
Mobility: | |||||||||
| Weight | 47.50 (t) | ||||||||
| Engine Power | 720 (h.p.) | ||||||||
| Specific Power | 15.16 (h.p./t) | ||||||||
| Top Speed | 42 (km/h) | ||||||||
| Reverse Speed | 20 (km/h) | ||||||||
| Traverse Speed | 26 (deg/s) | ||||||||
| Turret Traverse Speed | 24 (deg/s) | ||||||||
Survivability: | |||||||||
| Hit Points | 1550 (HP) | ||||||||
| Hull Armor | 140 / 100 / 60 (mm) | ||||||||
| Turret Armor | 195 / 120 / 100 (mm) | ||||||||
Spotting: | |||||||||
| View Range | 360 (m) | ||||||||
| Signal Range | 730 (m) | ||||||||
Crew: | |||||||||
| |||||||||

English
Español
Français
Português
Italiano
Český
Magyar
Hrvatski
Deutsch
Polski
Srpski
Latviešu
Dansk
Suomi
Lietuvių
Nederlands
Norsk
Română
Svenska
Türkçe
български
ελληνικά
Русский
українська


